Company Overview
  • Date of Incorporation:
  • August 1968

  • Number of employees:
  • (including Mainland factory) about 100 employees

  • Business:
  • Production and sales of miniature and sub-miniature lamps for toys, electronic appliances, vehicles and flashlights. High pressure xenon gas-filled lamps, lamp and LED reflector modules for flashlights.
  • Bank of Account:
  • HSBC
    Bank of China (HK) Ltd.
  • Director:
  • Joseph Wong

Quality Policy
  • 1. Customer Satisfaction
  • Our primary interest is to provide quality products to satisy the need of our customers.

  • 2. 5S visual management
  • The core of our management policy is the implementation of the 5S visual management.

  • 3. Application of ISO 9001
  • ISO 9001 quality management system is implemented to ensure better management system.

  • 4. Quality Objectives
  • Quality objectives are set and attempted to meet every year to keep on improvement.

Company History
  • 1968
  • Che Ling Flashlight Bulb Factory was established at Hung Hom, Kowloon, Hong Kong.

  • 1976
  • Bead-sealed subminiature lamps manufacturing machines were installed.

  • 1980
  • Mini-pepper subminiature lamps manufacturing machines were installed.

  • 1984
  • Mainland factory was established at Bao An area, Shenzhen, Mainland China.

  • 1985
  • Che Ling Flashlight Bulb Factory was changed to Limited company.

  • 1995
  • Miniature lamps manufacturing machines were installed.

  • 1998
  • Automatic filament mounting machines for miniature and subminiature lamps were installed.

  • 2001
  • New computer controlled filament winding machines were installed to replace the old machines.
    Vacuum furnaces were installed to produce high pressure xenon gas-filled lamps.
    New production lines were set up to assemble reflector modules. ISO 9001 certificate was acquired.

  • 2002
  • New bead-sealed and mini-pepper subminiature lamps manufacturing machines were installed to replace the old machines.
    New lens-end flashlight miniature lamps manufacturing machines were installed.

  • 2008
  • Old vacuum furnaces were modified to new computer-assisted control to help better control of the manufacturing processes.

  • 2009
  • New ISO 9001 management system was acquired.
    LED reflector modules were developed.

  • 2010
  • New automatic filament mounting machines for subminiature lamps were installed to replace the old machines.